Spill volumes and durations, south-east interceptor works, Nov. 2015 (archives)

During the month of November 2015, the City of Montreal carried out major maintenance work on the south-east interceptor, which required the latter to be put out of work. The result was a wastewater discharge whose duration and volume were estimated.

Données et ressources

Info additionnelle

Champ Valeur
Source
Version
Producteur
Courriel de l'auteur
Mainteneur
Courriel du mainteneur
Data Level
Agreement Required
Purpose Constraints
Redistribution Allowed
AI Training Allowed
Data Steward
Title (French) Volumes et durées des déversements, travaux intercepteur sud-est, Nov. 2015 (archives)
Update Frequency irregular
Geographic Scope []
Criticality Level []
Sensitivity Level unrestricted
Langue
Contact Person {"en": "Ville de Montréal", "fr": "Ville de Montréal"}
Contact Email donneesouvertes@montreal.ca
Dictionnaire de données ["environment"]
Open Canada Date Published 2016-03-22 00:00:00
Open Canada Date Modified
Open Canada Subject ["nature_and_environment"]
Open Canada Keywords {"en-t-fr": ["Spill", "Water", "River", "St. Lawrence River", "Interceptor", "SE", "Works"], "fr": ["Déversement", "Eau", "Fleuve", "Fleuve Saint-Laurent", "Intercepteur", "SE", "Travaux"]}
Open Canada Collection federated
Principal Organization
Reference Data
Official Source