Placer Mining Materials Handling Field Trials

This is an interim report by Wright Engineers Ltd., concerning the 1987 operation of the Airgold and Beron Placer tailings pumping systems.

The operating time achieved on both pumping systems has been too low to assess the effects of wear on the overall economics of the projects. At Beron, however, the pump failed due to a hole through the liner and casing after only 150 hours of operation. Wright's do not consider that the design/material selection has been optimized and steps have been taken to improve the life of the pump for 1988.

At Airgold, the pumping system was used for a total of 62.5 hours. The coupling connecting the pump to the diesel drive was replaced once and the replacement coupling has shown considerable wear. The failure of the coupling was probably due to misalignment which should be checked prior to reuse in 1988.

The test systems have proved that pumping of sluice tailings is practical, and may be economical, even when faced with the premature wear of the Beron pump.

Data and Resources

Additional Info

Field Value
Source
Version
Author
Author Email
Maintainer
Maintainer Email
Data Level
Agreement Required
Purpose Constraints
Redistribution Allowed
AI Training Allowed
Data Steward
Title (French)
Update Frequency unknown
Geographic Scope []
Criticality Level []
Sensitivity Level unrestricted
Language
Contact Person {"en": "Yukon Geological Survey", "fr": "Yukon Geological Survey"}
Contact Email eservices@gov.yk.ca
Data Dictionary []
Open Canada Date Published 2011-04-04 00:00:00
Open Canada Date Modified
Open Canada Subject ["science_and_technology"]
Open Canada Keywords {"en": ["ygs-import", "ygs-import-20250711", "ygs-publications", "yukon-geological-survey"], "fr-t-en": ["importation d'ygs", "ygs-import-20250711", "publications de l'YGS", "enquête géologique du yukon"]}
Open Canada Collection federated
Principal Organization
Reference Data
Official Source