Gold Run Creek Erosion Control Project 2006 Follow-up Monitoring

A large erosion cut, approximately 300 metres long and up to 50 metres deep, has occurred on a stockpile of frozen overburden on the east bank of Gold Run Creek, a placer mining area southeast of Dawson City. In September 2005 erosion control structures reinforced with live willow cuttings were installed at the site. These structures consisted of earth retaining walls built to stabilize the slope failure and a flume to convey the water past the retaining walls while the willows had time to grow and strengthen the structures. In July 2006 the site was revisited. It was found that, while the earth retaining walls were intact, the flume had malfunctioned and further erosion had occurred beyond the walls. It was concluded that the collapse of the flume was the primary cause of the failure of the erosion control project.

Data and Resources

Additional Info

Field Value
Source
Version
Author
Author Email
Maintainer
Maintainer Email
Data Level
Agreement Required
Purpose Constraints
Redistribution Allowed
AI Training Allowed
Data Steward
Title (French)
Update Frequency unknown
Geographic Scope []
Criticality Level []
Sensitivity Level unrestricted
Language
Contact Person {"en": "Yukon Geological Survey", "fr": "Yukon Geological Survey"}
Contact Email eservices@gov.yk.ca
Data Dictionary []
Open Canada Date Published 2011-04-04 00:00:00
Open Canada Date Modified
Open Canada Subject ["science_and_technology"]
Open Canada Keywords {"en": ["ygs-import", "ygs-import-20250711", "ygs-publications", "yukon-geological-survey"], "fr-t-en": ["importation d'ygs", "ygs-import-20250711", "publications de l'YGS", "enquête géologique du yukon"]}
Open Canada Collection federated
Principal Organization
Reference Data
Official Source